Project Detail for - VGK PRIME ROSE

  • Description
  • Specification
  • Availability Status
  • Construction Status
  • Payment Status
  • Site Plan
  • Route Map
  • Floor Plan
  • Brochure
Description

This is our new project named VGK PRIME ROSE and the construction was started on 26th January 2015. It is constructed covering an area of 4,574 Sq.Ft with 10 no.of.units in an apartment in the heart of Chennai City.It consist 2&3 bedroom apartment with sufficient ventilation.We have taken great care in ensuring the Customer is satisfied in every Aspect of the construction and timely completion.
 
Site address as given below:
Door No:4,Rajkumar  Avenue,
New Balaji Nagar Extn.
Selaiyur,
Chennai - 600 0073.

Specification

 

STRUCTURES:

=>R.C.C. Framed structures as per structural design 9” and 4½” thick Brick wall as per working drawing plastering as per standard.

STAIRCASE:

=>Remaining Levels-Granite Flooring.

LIFT LOBBY:

=>Floor: Combination of  Marble/Granite/Verified Tiles.

=>Ceiling: Plaster & painted with pleasing shades of Tractor Emulsion.

LIVING/DINING & PASSAGE:

=>Floors:Vitrified Tiles.

=>Walls:Plaster & painted with pleasing shades of Tractor Emulsion.

=>Ceiling: Plaster & painted with pleasing shades of Tractor Emulsion.

BEDROOM :

=>Floors:Vitrified Tiles.

=>Walls:Plaster & painted with pleasing shades of Tractor Emulsion.

=>Ceiling: Plaster & painted with pleasing shades of Tractor Emulsion.

BALCONIES:

=>Floors: Anti- Skid Ceramic Tiles

=>Railing : Parapet with MS railling

=>Ceiling : Exterior paint

=>Walls : Exterior paint

KITCHEN:

=>Floors: Vitrified Tiles .

=>Walls: Ceramic Tiles up to 4’ height above the counter level & rest painted with    pleasing shades of Tractor Emulsion.

=>Ceiling: Plaster & painted with pleasing shades of Tractor Emulsion.

TOILETS:

=>Floors:Anti-skid ceremic Tiles.

=>Walls:Selected Ceramic Tiles upto 7’0”  Height.

=>Fitting & Fixtures: Western WC Indian Closet and washbasin of  matching shades.   

     Diverter/Wall mixer

DOORS & WINDOWS:

=>Main Door - Teak wood frame

=>Doors: Country wood door frames.

=>Toilet Doors: 30mm thick full panel PVC Door.

=>M.S. Grill works for windows

=>Windows: UPVC with toughened glass.

ELECTRICAL

=>Wire : Copper Concealed

=>Switches: Modular Switches

Security System:

=>Secured gated community and one intercom point in each apartment

 

Availability Status

BLOCK -A:

S.NO FLAT NO. AREA RATE
/Sqft
BHK BASIC
COST
UDS AVAILABLE
[or] SOLD
Facing
1. G1 1233 4,350 3BHK 51,16,950 573 Sold East
2. F1 750 4,150 2BHK 31,12,500 382 Sold West
3. F2 847 4,150 2BHK 35,15,050 432 Sold West
4. F3 922 4,150 2BHK 38,26,300 470 Sold East
5. S1 1112 4,150 3BHK 46,14,800 567 Sold West
6. S2 855 4,150 2BHK 35,48,250 436 Sold West

 

BLOCK-B:

S.NO FLAT NO. AREA RATE
/Sqft
BHK BASIC
COST
UDS AVAILABLE
[or] SOLD
Facing
1. F1 864 4,150 2BHK 35,85,600 440 Sold West
2. F2 818 4,150 2BHK 33,94,700 417 Sold East
3. S1 864 4,150 2BHK 35,85,600 440 Sold West
4. S2 818 4,150 2BHK 33,94,700 417 Sold East

 

Construction Status

                            Under Construction

Payment Status

    1] At the time of Booking                          -           Rs. 1,00,000

    2] At the time of Agreement                      -           20%

    3] At the time of Registration                     -           35%

    4] On Completion of Foundation Work     -           10%

    5] On Completion of 1st Floor Roof Slab   -           10%

    6] On Completion of Brickwork                 -           10%

    7] On Completion of plastering work         -           05%

    8] On Completion of flooring work            -           05%

    9] At the time of Handing over                  -           Balance.

 

Site Plan
Route Map
Floor Plan

Block A-Ground Floor

Block A -First Floor

Block A- Second Floor

Block B-Ground Floor

Block B -First Floor

Block B- Second Floor

Brochure
Download